External works in Soham
Published: 16/05/22 By: Ashley Colcomb
Ashco have been over in Soham working on external works for our disabled client. New concrete landings and ramp will be fitted from the top of the existing structure to the new level access door threshold.
Construction of the permanent formwork on the new ramp is where the team will start. Paving slabs will be used along the edge of the ramp towards the rear and along the sides of the new construction and forming.
It is important that the levelling of the new ramp fits with the existing door threshold. Our client has chosen a concrete finish on the ramp. This runs to the existing gravel verge level. A tamped non-slip floated finish will be added to the concrete. This is very important for our disabled client as a fall or slip could be very damaging to them.
Before the new external door is started we will supply and fix galvanised posts and hand railings along the edge of the new ramp.
A new external door will be installed. This is a special level access door to the rear of our clients house. Our client has chosen a UPVC door.
If you would like more information on our disabled builds pleaseĀ click here
Categories: Projects