Cherry Hinton
Published: 15/05/22 By: Ashley Colcomb
Our team have been over in Cherry Hinton working on a client’s drainage on their driveway,
First the concrete is cutback from the junction to the house. A line trench is dug and filled with geo textile membrane.
New drain pipe is supplied and laid on a bed of pea shingle and then filled above the pipes once the pipes are laid.
To finish is to pea shingle is levelled with the surface of the driveway.
If you would like further details about domestic builds please click here