Carbon Reduction Plan
Home » Carbon Reduction Plan
1. Company Details
| Field | Details |
| Company Name | Ashco Building and Maintenance Services |
| Registered Address | The Demcom Stadium, Downham Road, Ely, CB6 2SH |
| Employees | 18 |
| Sector | Construction / Building & Maintenance |
| Date | 01/09/2025 |
2. Commitment to Achieving Net Zero
Ashco Building and Maintenance Services is committed to achieving Net Zero greenhouse gas emissions by 2050, in accordance with UK Government policy.
This Carbon Reduction Plan sets out our baseline emissions, current performance, and our approach to reducing emissions across all relevant scopes.
3. Methodology for Calculating Emissions
Ashco Building & Maintenance Services collects activity data and calculates greenhouse gas emissions in accordance with the GHG Protocol Corporate Accounting and Reporting Standard. UK Government GHG conversion factors are applied annually for performance review and reporting.
Organisational Boundary
Ashco applies the operational control approach to define its organisational boundary, capturing all sources over which the company has operational authority.
Activity Data Collection
- Scope 1 fleet emissions: derived from actual odometer/fleet management records for all 14 company vehicles
- Scope 1 heating: derived from fuel purchase invoices for the office premises
- Scope 2 electricity: derived from utility invoices / estimated meter readings for the office and light workshop
- Scope 3 categories: derived from supplier invoices, waste transfer notes, and industry-standard spend-based estimates where primary data is unavailable
Reporting Principles
Emissions data is prepared in line with the five GHG Protocol principles:
- Relevance – all material emission sources are included
- Completeness – all three scopes are reported
- Consistency – the same methodology and boundary are applied year-on-year
- Transparency – methodology and assumptions are documented
- Accuracy – UK Government emission conversion factors are used and reviewed annually
4. Baseline Emissions Footprint
Baseline Year: 2023
Using Ashco fleet data and industry-standard assumptions for office energy, waste and materials.
Scope 1 – Direct Emissions
| Source | Detail | Emissions |
| Company fleet (14 diesel vehicles) | 140,000 miles × 0.298 kg CO₂e/mile | 41.7 tCO₂e |
| Office heating fuel | Small office, fuel invoices | 1.2 tCO₂e |
| Total Scope 1 | 42.9 tCO₂e |
Scope 2 – Purchased Electricity
| Source | Detail | Emissions |
| Office / light workshop electricity | 8,000 kWh/year × 0.182 kg CO₂e/kWh (UK grid factor) | 1.5 tCO₂e |
| Total Scope 2 | 1.5 tCO₂e |
Scope 3 – Indirect Emissions
| Source | Estimated Emissions |
| Purchased materials (timber, cement, aggregates) | 16.0 tCO₂e |
| Waste disposal (skips, mixed construction waste) | 1.0 tCO₂e |
| Water | 0.2 tCO₂e |
| Business travel (private cars, occasional commuting) | 0.8 tCO₂e |
| Upstream transport of materials | 2.5 tCO₂e |
| Total Scope 3 | 20.5 tCO₂e |
Total Baseline Emissions (2023): ≈64.9 tCO₂e
5. Most Recent Reporting Year Emissions (2024)
The table below sets out Ashco’s most recent reported emissions for the year ending 31 December 2024.
| Scope | 2024 Emissions |
| Scope 1 | 41.0 tCO₂e |
| Scope 2 | 1.3 tCO₂e |
| Scope 3 | 19.0 tCO₂e |
| Total 2024 Emissions | 61.3 tCO₂e |
6. Carbon Reduction Targets
| Year | Target Emissions | Reduction vs Baseline |
| 2025 | 58 tCO₂e | 11% |
| 2030 | 40 tCO₂e | 38% |
| 2040 | 15 tCO₂e | 77% |
| 2050 | Net Zero | 100% |
7. Carbon Reduction Measures
Measures Implemented to Date
- Fuel efficiency programme for all drivers
- Regular fleet maintenance to improve mpg
- Office lighting replaced with LED
- Increased waste segregation and recycling
- Locally sourced materials to reduce transport emissions
- Digital record-keeping to reduce travel between sites
- Introduction of supplier environmental screening
Planned Measures (Next 1–3 Years)
- Phased introduction of electric and hybrid vans
- Installation of renewable electricity (solar PV) at office/workshop
- Telematics for fleet monitoring (idling, mileage, route efficiency)
- Increase use of low-carbon concrete and recycled aggregates
- Expanded subcontractor environmental requirements
- Staff training on low-carbon construction techniques
Long-Term Measures (3–10 Years)
- Fully electric fleet replacement
- Net-zero office/workshop building
- Procurement aligned with PAS 2080
- Majority of materials purchased with EPDs (Environmental Product Declarations)
8. Governance & Responsibility
The Managing Director has overall responsibility for:
- Annual emissions calculations, in accordance with the GHG Protocol Corporate Accounting and Reporting Standard
- Monitoring carbon reduction initiatives
- Reporting progress in line with the GHG Protocol
- Ensuring compliance with PPN 06/21 for all public-sector tenders
Performance is reviewed annually using UK Government GHG conversion factors.
9. Declaration
This Carbon Reduction Plan has been completed in accordance with PPN 06/21 and associated guidance on measuring and reporting greenhouse gas emissions. Emissions data has been collected and calculated in accordance with the GHG Protocol Corporate Accounting and Reporting Standard.
Happy clients
I can't thank you enough for all your company did for me. I love my new bathroom, the level access shower is great, I cant believe its mine. The staff all worked extremely hard and nothing was too much trouble!
5
Carol Nichols
Our new drive is amazing, Its made world of difference to the appearance of the house. We cant recommend the company enough.
5
Patrick Cornwall
Ashco worked so hard on our kitchen, clubhouse and changing rooms. Everyone that visits the club comments on how great it all looks. They showed great professionalism and worked to tight deadlines!
5
Ely City FC
Now that all the work on our lower terrace has been completed, I wanted to write to let you know how thrilled we are with everything. The retaining walls look wonderful and, when viewed from the river, set the house off beautifully.
Please give our thanks to Ian, Stuart, Tom, Finn, Ben and Dave - I do hope I haven’t forgotten anyone - for all their hard work during the hottest and driest weather we have had for a long time. Without exception they were a pleasure to have working here, and are a credit to Ashco
5
Mr & Mrs Loughton
Thank you so much to the window and door team for their work on my porch. Words cannot express how pleased I am with the result. Highly recommend Ashco Building Company.
5
Mrs Malkin
I'd like to say that I'm more than satisfied with the quality of the work you did for me recently, I wouldn't go anywhere else. Martin does a great job, he has a very friendly and pleasant manner and leaves everything very tidy and clean.
5
B. Monaghan
Get in touch
-
Ashco Building & Maintenance Services
C/O The Demcom Stadium
Downham Road
Ely
Cambridgeshire
CB6 2SH - 01353 698 261
- office@ashcoservices.co.uk